Mining and Metallurgy Engineering Bor (Jan 2019)

Stability of the dam "Prevoj Šaška" of the flotation tailing dump "Valja Fundata" in Majdanpek

  • Rajković Radmilo,
  • Obradović Ljubiša,
  • Kržanović Daniel,
  • Mikić Miomir

DOI
https://doi.org/10.5937/mmeb1902009R
Journal volume & issue
Vol. 2019, no. 1-2
pp. 9 – 18

Abstract

Read online

The existing dam "Prevoj Šaška" is located on the active flotation tailing dump "Valja Fundata" in Majdanpek. Since there is no valid documentation for the current maximum height of dam K+538 m, and disposal of tailings into this landfill is continued, the stability of dam has been carried out. Stability is calculated with the software SLIDE v6.0.