Mining and Metallurgy Engineering Bor (Jan 2024)

Block method of excavation with backfilling the excavated space of the Bor River deposit

  • Rajković Radmilo,
  • Kržanović Daniel,
  • Stojanović Miloš,
  • Šabaz Dragan,
  • Vojinović Ivica

DOI
https://doi.org/10.5937/mmeb2401029R
Journal volume & issue
Vol. 2024, no. 1
pp. 29 – 38

Abstract

Read online

The position of deposits and ore bodies for the underground mining in the underground mine Jama Bor, in relation to the terrain surface, old works of the Jama and Open Pit in Bor, and in relation to the mining infrastructure limits the selection of excavation methods with the applied technologies up to now. This paper presents the block method of excavation with backfilling the excavated space with the paste backfill of the Bor River deposit.

Keywords