E3S Web of Conferences (Jan 2019)

The principles of justification of an object construction duration

  • Oleinik Pavel,
  • Cherednichenko Nadezhda,
  • Shvedov Stefan,
  • Melnichuk Vitaliy

DOI
https://doi.org/10.1051/e3sconf/201911002126
Journal volume & issue
Vol. 110
p. 02126

Abstract

Read online

The duration of an object construction is considered as a parameter expressing the concentrated influence of all stages of its formation, including design, preconstruction, construction, etc. It is shown that the construction stage, as the final stage, is the most flexible and its components that include organization of construction, technology and mechanization of construction and installation works promptly implement solutions from all previous stages, consisting of a large number of various methods and ways of influencing the construction duration. These activities allow reducing energy costs and making production less energy intensive. The decisions on combining the work of the preconstruction and the main periods of construction are given as an example.