Nuclear Fusion (Jan 2024)
ICRH operations during the JET tritium and DTE2 campaigns
Abstract
The JET-ILW pure tritium and deuterium–tritium (DTE2) experimental campaigns took place in 2021–2022. Tritium (T) and deuterium–tritium (D–T) operations present challenges not encountered in present day tokamaks (Horton et al 2016 Fusion Eng. Des. 109–111 925–36). This contribution focuses on ion cyclotron resonance heating (ICRH) operations in tritium and deuterium–tritium plasmas, starting with a summary of the program of improvements to the ICRH system which spanned a few years prior to these experiments. Procedures were implemented to address specific constraints from tritium and deuterium–tritium operations (tritium safety and reduced access to the RF generator area) and increase the system reliability and power availability during plasma pulses. Operation of the upgraded real time RF power control system that maximises the launched power while taking into account limitations from the system or antenna coupling is described. We also report on the result from dedicated pulses performed to assess the potential harmful impact of the 2nd harmonic tritium resonance in the plasma, close to the inner wall, when using the standard central hydrogen minority ICRH scheme. During DTE2, the ITER-like antenna was not used because water leaked from an in-vessel capacitor into the vessel on day-2 of the experimental campaign. The lessons learnt from this incident are highlighted. Finally, the ICRH plant adjustments required to safely perform ion cyclotron wall cleaning discharges are described.
Keywords