Uncertainty Analysis of Geothermal Development Projects Using Exploratory System Dynamics Modelling and Analysis Method

  • Irwin Nathanael Hartono,
  • Andri D. Setiawan,
  • Akhmad Hidayatno,
  • Marmelia P. Dewi

DOI
https://doi.org/10.14716/ijtech.v14i7.6675
Journal volume & issue
Vol. 14, no. 7
pp. 1537 – 1547

Abstract

Read online

This study aimed to analyze uncertainty factors to provide knowledge and information regarding significant obstacles in developing geothermal energy in Indonesia. To achieve this, Exploratory System Dynamics Modelling and Analysis method was adopted. The results showed that four uncertainty factors have significant influence on the achievement of geothermal development in terms of total installed capacity, total revenue, and profit. Delay due to bureaucracy, social acceptance, exploration duration, and exploration permit processing time had 68% influence on total installed capacity and profit. Meanwhile, electricity price had 44% impact on total revenue. In conclusion, focus should be given to policy interventions such as streamlining bureaucratic processes, reducing delays, and shortening processing times, to enhance installed capacity and profit growth in the future.

Keywords