Fiabilitate şi Durabilitate (May 2013)

CALCULATION OF RESIDUAL LIFETIME FOR LIFTING INSTALATION – GANTRY CRANE MPT 20/5

  • Cătălin IANCU,
  • Florin VÎLCEANU

Journal volume & issue
Vol. 1-supl
pp. 173 – 179

Abstract

Read online

In this paper is presented step-by-step the calculus made in order to establishing the residuallifetime of a lifting crane using also non-destructive methods to establish the actual state of machine andareas subject to study, conducting to an extension up to 5 times of residual lifetime,but at 2/3 from initialload.

Keywords