International Journal of Industrial Engineering Computations (Aug 2014)

A production inventory model with flexible manufacturing, random machine breakdown and stochastic repair time

  • S.R. Singh,
  • Leena Prasher

DOI
https://doi.org/10.5267/j.ijiec.2014.7.003
Journal volume & issue
Vol. 5, no. 4
pp. 575 – 588

Abstract

Read online

This paper derives a production inventory model over infinite planning horizon with flexible but unreliable manufacturing process and the stochastic repair time. Demand is stock dependent and during the period of sale it depends on reduction on selling price. Production rate is a function of demand and reliability of the production equipment is assumed to be exponentially decreasing function of time. Repair time is estimated using uniform probability density function. The objective of the study is to determine the optimal policy for production system, which maximizes the total profit subject to some constraints under consideration. The results are discussed with a numerical example to illustrate the theory.

Keywords