E3S Web of Conferences (Jan 2021)

Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projects

  • Zhou Ming,
  • Lu Shengwei,
  • Wu Qiang,
  • Jin Sha,
  • Yan Jiong,
  • Sang Zixia

DOI
https://doi.org/10.1051/e3sconf/202123301015
Journal volume & issue
Vol. 233
p. 01015

Abstract

Read online

With the strengthening of external supervision and the management requirements of internal quality and efficiency improvement of power grid, it is particularly important to improve the lean level of power grid investment. However, the accuracy and scientificity of the current grid infrastructure project investment plan adjustment need to be further improved, and the basis for the completion of investment submission is the on-site construction progress. Therefore, this topic carries out the analysis of the factors affecting the construction progress, including the types of the factors affecting the construction, the depth and breadth of the impact, and the impact of the milestone stage, and takes the analysis results of the shutdown factors as the reference basis for the adjustment of the investment plan, so as to improve the investment management level of the company.