MATEC Web of Conferences (Jan 2017)
Life cycle guideline of petrochemical plant underground piping system
Abstract
According to statistics of petrochemical plant disaster, the type of underground pipeline leakage is the highest proportion, for example, Kaohsiung gas explosion in 2014 is a typical case. Therefore, improvement strategy of petrochemical plant underground piping system from both engineering and management becomes an important issue. Through reviewing regulations as well as surveying questionnaire, including kinds of piping materials, 3D drawing files, operation procedures, information sharing, etc., the findings show lack contact of integrated management with engineering executive and insufficient technical requirements are major defects. Overviewing current problems of domestic petrochemical plant underground piping system management, and comparing to international criteria and specifications, this research focuses on the of piping design, construction, operations, maintenance, and inspection. Then management procedures and engineering technical feasibility strategies are suggested. In addition, the proposed life cycle guideline in order to reduce the disaster incidence of petrochemical plant underground pipelines.