Geofluids (Jan 2022)
A Method to Improve Computational Efficiency of Productivity Evaluation with Rectangular Coalbed Methane Reservoir
Abstract
Computational efficiency is the key factor to be considered in the productivity evaluation of rectangular coalbed methane reservoir. There are three main factors affecting the calculation speed: the nonlinearity of the material balance equation of coalbed methane reservoir, the poor conductivity of fractures cannot be considered as infinite conductivity fractures, and the Duhamel convolution is needed in history fitting and boundary image inversion. At present, there is no method to quickly evaluate the productivity of finite conductivity fracture model in rectangular coalbed methane reservoir. Diffusion equation of matrix is generated by the Fick diffusion law. The Darcy seepage law is used to build the seepage equation of fractured system in coalbed methane reservoir. In order to transform the calculation result of infinite conductivity fracture into finite conductivity fracture, fracture conductivity factor is employed in this paper. The applicability of fracture conductivity factor in the whole production process is clarified. It is clear that the factor is prone to calculation errors when the time is small, and the calculation fluctuates greatly. According to the characteristics of the Riley method and discrete method, an accurate and efficient analytical solution calculation process is designed. This will make the calculation results accurate. A production evaluation method of rectangular coalbed methane reservoirs with fractured vertical well and finite conductivity fracture is proposed. The purpose of quickly and accurately predict well production capacity is reached. The geological parameters are recombined, and new coalbed methane reservoir flow parameters are defined. Through parameter sensitivity analysis, the influence of different flow characteristic parameters on gas production is clarified. The dimensionless transfer constant and dimensionless storage capacity affect the appearance time of desorption and diffusion and the storage capacity of the fracture system, respectively. The dimensionless desorption constant describes the strength of desorption and diffusion. The influence of fracture conductivity factor on production is studied. It is clarified that its impacts are different in the early stage and the later stage of production. There is a limit to the fracture conductivity factor. When the limit is exceeded, the fracture conductivity factors no longer affect the production of a single well. The findings of this study can understand the percolation stage of finite conductivity fractured wells with rectangular coalbed methane reservoir and can also guide fracturing design and writing in the field. The research results enrich the productivity evaluation model of coalbed methane reservoir. In the end, a set of production evaluation method is put forward suitable for the well in rectangular coalbed methane reservoirs with fractured vertical well and finite conductivity fracture. In this paper, the influence of fracture conductivity on single well productivity in rectangular coalbed methane reservoir is quantitatively evaluated for the first time. By improving the calculation method and optimizing the calculation path, the productivity evaluation calculation speed of finite conductivity fractured wells in rectangular coalbed methane reservoir is optimized without affecting the calculation accuracy. The new method can be applied directly to productivity evaluation software, which has the significance of popularization.