Applied Sciences (Apr 2017)

Jointly Production and Correlated Maintenance Optimization for Parallel Leased Machines

  • Tarek ASKRI,
  • Zied HAJEJ,
  • Nidhal REZG

DOI
https://doi.org/10.3390/app7050461
Journal volume & issue
Vol. 7, no. 5
p. 461

Abstract

Read online

This paper deals with a preventive maintenance strategy optimization correlated to production for a manufacturing system made by several parallel machines under lease contract. In order to minimize the total cost of production and maintenance by reducing the production system interruptions due to maintenance activities, a correlated group preventive maintenance policy is developed using the gravity center approach (GCA). The aim of this study is to determine an economical production plan and an optimal group preventive maintenance interval Tn at which all machines are maintained simultaneously. An analytical correlation between failure rate of machines and production level is considered and the impact of the preventive maintenance policy on the production plan is studied. Finally, the proposed maintenance policy GPM is compared with an individual simple strategy approach IPM in order to illustrate its efficiency.

Keywords