Journal of Intelligent Systems (Nov 2021)
Construction design based on particle group optimization algorithm
Abstract
The machines exhibit an intelligence which is artificial intelligence (AI), and it is the design of intelligent agents. A system is represented by an intelligent agent who perceives its environment and the success rate is maximized by taking the action. The AI research is highly specialized and there are two subfields and each communication fails often. The popular AI approaches include the traditional symbolic AI and computational intelligence. In order to optimize the seismic design of the reinforced concrete pier structure, the particle swarm optimization (PSO) algorithm and the reaction spectrum analysis method are combined; they establish a regular bridge of the design variable with cross-sectional characteristics and reinforcement ratios, with the target function. The seismic optimization design framework of the pier is transformed into a multi-objective optimization problem. Calculations show that the method can quickly obtain the optimal design parameters that meet multi-objective requirements. The improved PSO main program and the calling push-over program run time are 4.32 and 1347.56 s, respectively; the push-over program running time is 99.68% of the run time of the total program. Optimization of the seismic performance of the rear bridge pier is significantly improved and is more in line with the design method; the design method proposed in this article is more practical.
Keywords