EPJ Web of Conferences (Mar 2014)

The transfer RIB lines to the DESIR facility at GANIL-SPIRAL2

  • Perrot Luc,
  • Cherif Hamda

DOI
https://doi.org/10.1051/epjconf/20146611029
Journal volume & issue
Vol. 66
p. 11029

Abstract

Read online

The new ISOL facility SPIRAL2 is currently being built at GANIL, Caen France. SPIRAL2 will produce a large number of new radioactive ion beams (RIB) at high intensities. The DESIR facility will receive beams from the upgraded SPIRAL1 facility of GANIL (stable beam and target fragmentation), from the S3 Low Energy Branch (fusion-evaporation and deep-inelastic reactions) and from the SPIRAL2 production cave (n-induced fission of 238U, nucleon transfer and fusion-evaporation reactions). In order to deliver the RIB to the experimental set-ups installed in the DESIR hall, 110 meters of beam line have to be designed, originating from 3 different facilities. This paper will focus on the studies which have been done on these transfer lines: beam optics and errors calculations, quadrupoles, diagnostics and mechanical designs.