International Journal of Construction Supply Chain Management (Dec 2021)

A model for measuring distruption risk in the prefabrication supply chain

  • Somik Ghosh,
  • Mustafa Hamad

DOI
https://doi.org/10.14424/ijcscm110221-69-88
Journal volume & issue
Vol. 11, no. 2
pp. 69 – 88

Abstract

Read online

Use of prefabrication in construction projects is increasing due to the benefits in cost, time, quality, and safety. However, utilizing prefabrication introduces uncertainties inherent with the supply chain of the process. These uncertainties, if not managed, can disrupt the prefabrication process and result in schedule delays and cost overruns. This study proposes a model to measure disruption risks in the prefabrication process. The model was used in measuring the disruption risks of prefabrication of headwalls in patients’ rooms for a healthcare project as a pilot study. The risk model could successfully identify the disruption risks originating anywhere in the supply chain based on input information such as required material quantity, batch sizes of material deliveries, production rates, and batch sizes of transporting the headwall units. Using the model, the project team identified two uncertainties that could lead to possible disruptions: the start of the prefabrication processes and the required production rate to meet the on-site schedule. This is a first step to developing a risk exposure model that can prove valuable to the risk managers to analyse and manage the impact of disruptions. This will help the risk managers in making informed decisions about where to focus their limited resources.

Keywords