E3S Web of Conferences (Jan 2023)

Technique for estimating the time spent on measuring and computing process in three-dimensional electrical impedance tomography

  • Aleksanyan Grayr,
  • Kucher Artem,
  • Shcherbakov Ivan

DOI
https://doi.org/10.1051/e3sconf/202342005002
Journal volume & issue
Vol. 420
p. 05002

Abstract

Read online

The work is devoted to the problems of estimating time delays that arise in studies using the method of three-dimensional electrical impedance tomography. The block diagram of the hardware-software complex of three-dimensional electrical impedance tomography is considered. A general algorithm for visualizing the internal structures of the object under study by the method of three-dimensional electrical impedance tomography is described, and it is shown which parts of it affect the occurrence of time delays. Methods for minimizing the time delays that occur during research are described, which will reduce the time for obtaining research results and increase the frequency of their output.