Стратегические решения и риск-менеджмент (Jul 2018)

Integration of the evaluation institute's instruments into the procedures for justifying the initial (maximum) price of the contract in the procurement activities

  • A. A. Bakulina,
  • R. L. Rovbel

DOI
https://doi.org/10.17747/2078-8886-2018-2-70-75
Journal volume & issue
Vol. 0, no. 2
pp. 70 – 75

Abstract

Read online

Analysis of the legal and economic support of the public procurement system and the functions of control and monitoring procedures in the modern model of public procurement in the Russian Federation is an important issue in the region of competition. The main innovations and weaknesses in the regulations and results of control procedures at the planning, placement, evaluation and control stages were identified. Conclusions and recommendations on improving the effectiveness of the public procurement control system in Russia are developed through the integration of modern valuation tools and the inclusion of control measures in the process, the formation of experts' conclusions regarding the justification and confirmation of the cost characteristics of the contract in government procurement and procurement of state corporations. The specifics of the institutionalization of control processes in the mechanism of public procurement are considered.The theoretical and practical principles of improving the system of control over public procurement in Russia are studied. The approach to the formation of proposals on additional regulation of control procedures in the contract system is formulated with the aim of providing a qualitative effect on procurement processes.

Keywords