Revista Fuentes El Reventón Energético (Dec 2010)

OPTIMIZACIÓN DE PRODUCCIÓN DE LAS UNIDADES DE FLUJO X1 Y X2 UTILIZANDO CHOQUES EN FONDO

  • Alvaro Prada,
  • Fernando Enrique Calvete González,
  • German Castillo Salamanca

Journal volume & issue
Vol. 8, no. 2
pp. 65 – 71

Abstract

Read online

This work describes a methodology to optimize the production of the wells that presents crossed flow. Initially by means of modeling in a nodal analysis software the wells with problems are selected to optimize them. By means of the analysis of the IRP curves (Inflow Performance Relationship ) and TPC ( Tubing Performance Curves ) of these wells the characteristics of the Cv coefficient are specified for a flow control valve in order to optimize the production in 3 1/2" tubing to optimize the production.

Keywords