MATEC Web of Conferences (Jan 2017)

Optimization of the annual construction program solutions

  • Oleinik Pavel,
  • Yurgaytis Alexey

DOI
https://doi.org/10.1051/matecconf/201711700130
Journal volume & issue
Vol. 117
p. 00130

Abstract

Read online

The article considers potentially possible optimization solutions in scheduling while forming the annual production programs of the construction complex organizations. The optimization instrument is represented as a two-component system. As a fundamentally new approach in the first block of the annual program solutions, the authors propose to use a scientifically grounded methodology for determining the scope of work permissible for the transfer to a subcontractor without risk of General Contractor’s management control losing over the construction site. For this purpose, a special indicator is introduced that characterizes the activity of the general construction organization - the coefficient of construction production management. In the second block, the principal methods for the formation of calendar plans for the fulfillment of the critical work effort by the leading stream are proposed, depending on the intensity characteristic.

Keywords