E3S Web of Conferences (Jan 2021)
Discussion on construction scheme of aqueduct structure repair and water stop belt replacement in South-to-North Water Diversion project
Abstract
Taking Shahe and Dalang River aqueducts as an example, this paper introduces a movable and reusable waterproof device for aqueduct construction, which is suitable for construction scheme of structure repair and waterstop belt replacement for large-scale water delivery aqueduct of Shahe River and Dalang River in South-to-North Water Diversion Project. It aims to solve structural damage and waterstop belt leakage of the aqueducts of Shahe River and Dalang River in the South-to-North Water Diversion Project, realizing the aqueduct construction with uninterrupted water supply, and structure repair and waterstop belt replacement in the waterless environment separated by watertight device in the aqueduct construction.