PLoS ONE (Jan 2024)
Prioritization of control measures in leakage scenario using Hendershot theory and FBWM-TOPSIS.
Abstract
Currently, there is increasing concern about the safety and leakage of process industries. Therefore, the present study aims to prioritize control measures before and after the leakage scenario by using the Hendershot theory and MCDM techniques. In this study, two proactive and reactive layers were selected before and after leakage of tanks, respectively. Then, criteria and alternatives were selected to perform fuzzy TOPSIS (FTOPSIS) and find the best alternative based on the literature review and Hendershot approach. The linear model of the fuzzy Best-Worst method (FBWM) was constructed and resolved using Lingo 17 software. Subsequently, criteria were assigned weights based on thorough calculations of the inconsistency rate. The weight of study experts was equal to 0.25. The results of FBWM showed that the reliability index with a weight of 0.3727 was ranked first and the inconsistency rate ([Formula: see text]) was calculated to be equal to 0.040. Inherent Safety Design (ISD) (0.899) and passive safety (0.767) also ranked first before and after tank leaks, respectively. Using the FBWM method leads to fewer pairwise comparisons and at the same time more stability. Although ISD and passive strategies are more valid and strict, elements of all strategies are necessary for a comprehensive process safety management program.