Water Science and Technology (Jul 2023)

Performance of modified first-stage French Vertical Flow Constructed Wetlands under extreme operational conditions

  • María Belén Arévalo-Durazno,
  • Jorge Alejandro García Zumalacarregui,
  • Long Ho,
  • Andrea Narváez,
  • Andrés Alvarado

DOI
https://doi.org/10.2166/wst.2023.201
Journal volume & issue
Vol. 88, no. 1
pp. 220 – 232

Abstract

Read online

Operation conditions considerably affect the removal efficiency of wastewater treatment systems, and yet we still lack data on how these systems function under extreme dilution rates and climatic conditions at high altitudes. Here, we applied two modified First-Stage French Vertical Flow Constructed Wetlands (FS-FVFCWs) for sewage treatment in Northern Tropical Andes. Specifically, within 18 months, we conducted a pilot-scale experiment at two hydraulic loading rates (HLRs) of 0.94 and 0.56 m d−1, representing 2.5 and 1.5 times the recommended design values, with two different feeding/resting periods to investigate the impact of HLRs and operational strategy on system performance. We found that chemical oxygen demand (COD) and total suspended solids (TSS) removal was satisfactory, with average values of 53 ± 18 and 69 ± 16%, respectively. Moreover, reducing HLRs resulted in higher removal efficiency for COD, from 46 ± 15 to 64 ± 15%, but had no impact on TSS removal, with 3 days of feeding and 6 days of resting. For an equal time of feeding and resting, COD and TSS removals were not affected by the modified HLR. These findings suggest that high HLRs can be applied to FS-FVFCW without compromising the system operation and obtaining satisfactory results, leading to opportunities to reduce areas and costs. HIGHLIGHTS The FS-FVFCW has a satisfactory performance with HLRs higher than the recommended ones.; Increasing HLRs has an impact on COD removal but does not have any impact on TSS removal.; Significant reduction in the land requirement for the FS-FVFCW can be achieved when treating diluted wastewater.;

Keywords