MATEC Web of Conferences (Jan 2017)

Analysis and Countermeasures of PPP Project Implementation Difficulties

  • Xu Yifeng,
  • Chang Wei

DOI
https://doi.org/10.1051/matecconf/201710005039
Journal volume & issue
Vol. 100
p. 05039

Abstract

Read online

Since the beginning of 1995, the model of PPP project construction was introduced in China. It has been widely used in many fields such as energy, municipal, and so on. It has accumulated a lot of experience in improving the investment system structure and guiding the social capital into the infrastructure field. But the mode of PPP project construction in the implementing process in different environment often encounters a lot of problems. Based on a large amount of analysis on the existing literature, this paper resorts out the PPP project model combining the problems occurred in the implementation process of PPP project, and summarizes corresponding countermeasures aiming at the problems in order to provide help for PPP project implementation in the future.

Keywords