Podzemni Radovi (Jan 2014)
Functional dependence on construction costs of horizontal mining facilities in lead-zinc ore
Abstract
This paper presents a methodology for determination of the two parameter dependence on construction costs of horizontal mining facilities in the lead-zinc ore. Construction costs are shown as a function of the profile area on facilities and the degree of jointed on the rock, presented by the change in their uniaxial compressive strength.
Keywords