IN-SERVICE REMEDIATION OF A RAILWAY EMBANKMENT TO PREVENT SETTLEMENT

  • Jan Grepl

DOI
https://doi.org/10.14311/APP.2019.23.0020
Journal volume & issue
Vol. 23, no. 0
pp. 20 – 24

Abstract

Read online

After optimization of the railway geometry for higher speed, a continuous settlement of the track occurred. Improvement of the embankment body was needed; however, a complete traffic interruption was not allowed. The reconstruction work has been done using the methods of special ground engineering such as vibro-stone columns and driven ductile piles.