Archives of Metallurgy and Materials (Jun 2016)

Material Factors in Relation to Development Time in Liquid-Penetrant Inspection. Part 1. Material Factors

  • Irek P.,
  • Słania J.

DOI
https://doi.org/10.1515/amm-2016-0089
Journal volume & issue
Vol. 61, no. 2
pp. 509 – 514

Abstract

Read online

In technical publications and European Standards the development time (i.e. time of getting out of penetrant from a discontinuity to the material surface) in penetration testing is specified within the range of 10-30 minutes. In practice, however, it is seen , that it is closely connected

Keywords