IEEE Access (Jan 2023)

Effective Scheduling of Multi-Load Automated Guided Vehicle in Spinning Mill: A Case Study

  • Parkavi Krishnamoorthy,
  • N. Satheesh,
  • D. Sudha,
  • Sudhakar Sengan,
  • Meshal Alharbi,
  • Denis A. Pustokhin,
  • Irina V. Pustokhina,
  • Roy Setiawan

DOI
https://doi.org/10.1109/ACCESS.2023.3236843
Journal volume & issue
Vol. 11
pp. 9389 – 9402

Abstract

Read online

In the Flexible Manufacturing System (FMS), where material processing is carried out in the form of tasks from one department to another, the use of Automated Guided Vehicles (AGVs) is significant. The application of multiple-load AGVs can be understood to boost FMS throughput by multiple orders of magnitude. For the transportation of materials and items inside a warehouse or manufacturing plant, an AGV, a mobile robot, offers extraordinary industrial capabilities. The technique of allocating AGVs to tasks while taking into account the cost and time of operations is known as AGV scheduling. Most research has exclusively addressed single-objective optimization, whereas multi-objective scheduling of AGVs is a complex combinatorial process without a single solution, in contrast to single-objective scheduling. This paper presents the integrated Local Search Probability-based Memetic Water Cycle (LSPM-WC) algorithm using a spinning mill as a case study. The scheduling model’s goal is to maximize machine efficiency. The scheduling of the statistical tests demonstrated the applicability of the proposed model in lowering the makespan and fitness values. The mean AGV operating efficiency was higher than the other estimated models, and the LSPM-WC surpassed the different algorithms to produce the best result.

Keywords