Engineering Reports (Mar 2024)

Statistical mapping and data collection of critical equipment failures in the weaving section of textile manufacturing

  • Bett Brian Kipchumba,
  • Peter Chemweno,
  • Jerry Ochola,
  • Eric Oyondi Nganyi

DOI
https://doi.org/10.1002/eng2.12743
Journal volume & issue
Vol. 6, no. 3
pp. n/a – n/a

Abstract

Read online

Abstract The study's foundation was a scenario analysis of a textile mill's weaving department, with the goal of determining the necessity of a reliable and comprehensive plan for scheduling maintenance time. According to the background information and problem statement, incidents of Run failure maintenance and lengthy downtime (up to 60 days) undermine the machines' availability. The desired efficiency and production are 90% and 194.76 m, respectively; however, the preliminary results indicated less. This indicated a gap that must be closed by implementing regular and appropriate maintenance plans. Additionally, the incoherent and inconsistencies points at a lack of an efficient maintenance plan. It was established that the current strategy is not optimized and does not ensure machine availability because there are disparities and irregularities in the maintenance of crucial equipment. The objective of the study was to map out the critical equipment and collect data on the number and time between failures encountered in the weaving section of the textile manufacturing processes. Failure mode and effect analysis and fish‐bone diagram were used in the analysis of the data. Mapping results indicated downtime up to 60 days, the productivity was estimated at 194.76 m, and efficiency was 90%. The results showed that the critical equipment were the essential piece of machinery in the production line of a textile mill.

Keywords