Известия Томского политехнического университета: Инжиниринг георесурсов (Jun 2024)

Prediction of emergency-free operation of production wells with a horizontal termination under conditions of high removal of mechanical impurities on the example of the Severo-Komsomolskoe field

  • Olga V. Savenok,
  • Nailya Kh. Zharikova,
  • Alexander E. Verisokin,
  • Abdul-Gapur H. Kerimov,
  • Ashot S. Arutyunyan

DOI
https://doi.org/10.18799/24131830/2024/6/4368
Journal volume & issue
Vol. 335, no. 6

Abstract

Read online

Relevance. As readily available oil reserves are developed and production technologies develop, oil and gas companies are gradually moving to the development of previously unprofitable assets. Over the past five years, several oil-and-gas condensate fields with oil rims have been put into operation in Western Siberia. Their development is further complicated by oil high viscosity and poor cementation of the reservoir rocks. Low values of critical drawdown do not allow oil to be produced without destruction of the productive formation, and mechanical impurities entering the well lead to spillage of perforation intervals and downhole equipment failures. The use of mathematical modeling in relation to the operation of wells in the conditions of the removal of mechanical impurities will make it possible to control production and select the optimal well operation mode. Aim. Forecasting the trouble-free operation of a production well under conditions of high removal of mechanical impurities. Objects. Producing oil wells; the subject of the study is the movement of solid particles in the wellbore of a production well, the relationship and dependence of formation of sand plugs on the operating parameters of the well. Methods. Theoretical research methods – analysis (analysis of models for calculating the critical flow velocity in a horizontal pipe (calculation of the critical velocity in a single-phase flow; calculation of the critical velocity in a multi-phase flow; calculation of the critical velocity based on the balance of forces)) and modeling (simulation of work wells with the removal of mechanical impurities). The totality and combination of these methods are adequate to the goals and objectives, the object and subject of the study of this work. Results. The problem of sand production is typical not only for fields that are in the late stages of development, but also for fields that have recently been put into operation. Sand shows up are a complicating factor in the operation of wells at the Severo-Komsomolskoe high-viscosity oil field located in Western Siberia. The main object of development of the studied field is a weakly cemented sandy layer. Oil production in such difficult areas requires a very careful approach to the choice of development system, to the selection of methods to deal with complications, including the choice of the right method to limit sanding. However, regardless of the approach taken to solve the problem of sand production, some rock will still flow into the well. To prevent the formation of sand plugs, it is necessary to understand the nature of the movement of solid particles along the wellbore. It is possible to assess whether a well is capable of carrying out solid particles from a horizontal section using modeling in specialized software products. Modeling of the well operation, taking into account the influence of mechanical impurities, made it possible to solve the following problems: 1) determine the fluid to carry rock particles out of the horizontal section; 2) identify the areas in which there is a risk of sand plugs; 3) present the dependence for calculating the critical speed for high-viscosity oil with different water cut; 4) assess how the water cut and gas factor affect well operation in conditions of high removal of mechanical impurities; 5) calculate the time of formation of sand plugs.

Keywords