Antimicrobial Resistance and Infection Control (Jan 2024)

On-site evaluation as external quality assessment of microbiology laboratories involved in sentinel laboratory-based antimicrobial resistance surveillance network in Burkina Faso

  • Emmanuel Zongo,
  • Emilie Dama,
  • Dame Yenyetou,
  • Merci Muhigwa,
  • Abdoulaye Nikiema,
  • Georges Anicet Dahourou,
  • Abdoul-Salam Ouedraogo

DOI
https://doi.org/10.1186/s13756-023-01362-5
Journal volume & issue
Vol. 13, no. 1
pp. 1 – 10

Abstract

Read online

Abstract Background The laboratory-based surveillance of antimicrobial resistance (AMR) is a priority component of the multisectoral national action plan to combat AMR in Burkina Faso. This study aimed to assess the QMS of microbiology laboratories involved in the Sentinel laboratory-based antimicrobial resistance surveillance network in Burkina Faso. Methods A cross-sectional study was conducted from September 1st to November 30th, 2022. The external quality assessment (EQA) method used was on-site evaluation using a checklist that was developed and validated by a technical committee of experts. Teams of two, including an antimicrobial susceptibility test (AST) specialist and a QMS specialist, were trained on this checklist to conduct the assessment. Satisfactory performance was defined as any on-site evaluation score 80% and above with the aim of developing action plans to address gaps. Results All 18 laboratories were evaluated. The overall average performance score of the participating laboratories was 40%. The highest overall performance score was 58%, and the lowest overall performance score was 26%. The average overall scores were not significantly different between private and public laboratories (p value = 0.78). The only section of the checklist with the satisfactory performance concerned the “Analytical step of AST”, with 76.5% (13/17) of the sentinel laboratories having a score ≥ 80%. Conclusion The performance of the QMS of the sentinel laboratories in Burkina Faso for AMR surveillance was unsatisfactory, and a corrective action plan was proposed to support these laboratories in improving their QMS over the next 3 years.

Keywords