Nauka ta progres transportu (Jan 2008)

AUTOMATED INFORMATION CONTROL SYSTEM OF MAGNETO LEVITATING CREW

  • V. O. Dzenzerskyi,
  • S. V. Plaksin,
  • L. M. Pohorelaia,
  • I. I. Sokolovskyi

Journal volume & issue
Vol. 20
pp. 182 – 187

Abstract

Read online

It is suggested the concept of construction of automated information-control system (ICS) for Maglev on the basis of usage of highway mark-connecting communication wave guide line with groups of input connecting holes placed along active way structure. The excitation of wave guide line is carried out by the modulated microwave signals with the information about spatial position of Maglev, its speed, and also about parameters of propulsion system.

Keywords