E3S Web of Conferences (Jan 2022)
Research and application of water flooding injection and production technology after polymer flooding
Abstract
For reservoir water flooding after polymer flooding injection points existing in the mining process of high temperature resistant performance is poor and multistage unlock difficulty, examination, and the sealing problems such as in-depth study and analysis, innovation to a new set of return to spit points injection points production technology, to produce more suitable sealing high voltage can be found on a variety of well conditions return to spit points a column technology, is helpful for better improvement points injection tube service life, At the same time, it can effectively solve the problem of clogging downhole concentric test and adjustment unit. Oilfield exploration into the follow-up after water flooding stage, the well will show the water fast, fast production decline, the characteristics of a return so often need to take back to spit on mining technology, but the technology has high pressure resistance and multistage unlock difficulty problem, makes the life of the mining process is shorter, so according to the technical problems existing in the in-depth study and analysis, The effective outcome measures are put forward to provide necessary technical support for reservoir benefit after polymer flooding.
Keywords