Lietuvos Matematikos Rinkinys (Dec 2004)
Applying the decision aids systems for hydropower expand process
Abstract
The ELECTRE method is used for the projects evaluation and outranking. The Nemunas river hydropower station projects are taken into account. The case study of sensitivity analysis on the weighted criteria is presented.
Keywords