Metals (Nov 2021)

Dispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning

  • Ning Li,
  • Shuzhao Feng,
  • Haiwang Ye,
  • Qizhou Wang,
  • Mingtao Jia,
  • Liguan Wang,
  • Shugang Zhao,
  • Dongfang Chen

DOI
https://doi.org/10.3390/met11111848
Journal volume & issue
Vol. 11, no. 11
p. 1848

Abstract

Read online

The working environment of underground mines is complicated, making it difficult to construct an underground mine production plan. In response to the requirements for the preparation of a short-term production plan for underground mines, an optimization model for short-term resource planning was constructed, with the goal of maximizing the total revenue during the planning period. The artificial bee colony optimization algorithm is used to solve the model using MATLAB. According to the basic requirements of underground mine ore haulage and ore hoisting, a haulage equipment inter-stopes dispatch plan model was constructed, with the primary goal of minimizing the haulage equipment wait time. A non-dominated sorting genetic algorithm is used to solve the optimization model. An underground mine is examined using the two models, and the optimization results are compared and verified with the scheme obtained by using traditional optimization algorithms. Results show that based on the improved optimization algorithm, the use of short-term production planning schemes to guide mine production operations can increase the haulage equipment utilization rate, thereby increasing mine production revenue.

Keywords