Archives of Civil Engineering (Dec 2017)

Priority Scheduling in the Planning of Multiple-Structure Construction Projects

  • Radziszewska-Zielina E.,
  • Sroka B.

DOI
https://doi.org/10.1515/ace-2017-0038
Journal volume & issue
Vol. 63, no. 4
pp. 21 – 33

Abstract

Read online

The paper presents a method of priority scheduling that is useful during the planning of multiple-structure construction projects. This approach is an extension of the concept of interactive scheduling. In priority scheduling, it is the planner that can determine how important each of the technological and organisational constraints are to them. A planner’s preferences can be defined through developing a ranking list that defines which constraints are the most important, and those whose completion can come second. The planner will be able to model the constraints that appear at a construction site more flexibly. The article presents a general linear programming model of the planning of multiple-structure construction projects, as well as various values of each of the parameters that allow us to obtain different planning effects. The proposed model has been implemented in a computer program and its effectiveness has been presented on a calculation example.

Keywords