E3S Web of Conferences (Jan 2021)

Study on Design of Concrete Box Girder of A Railway Swivel Cable-Stayed Bridge

  • Liu Yang,
  • Ding Tenghui,
  • Xie Qinyun,
  • Xu Guangli,
  • Li Chao

DOI
https://doi.org/10.1051/e3sconf/202123703026
Journal volume & issue
Vol. 237
p. 03026

Abstract

Read online

A swivel cable-stayed bridge over the existing railway is a span across the existing railway. The recommended scheme for the main bridge is (128 + 388 + 128) m steel mixed composite beam swivel diagonal pull bridge with span. The cables of the diagonal pull bridge are arranged according to the fanshaped central double cable plane, taking into account the mechanical performance and aesthetics. The bridge structure adopts semi floating system. The concrete swivel diagonal pull bridge is adopted in the comparison scheme. The design of the bridge is three spans and (138 + 268 + 138) m prestressed concrete box girder is adopted. The cables are arranged according to the central double cable plane, and the bridge composition adopts the consolidation system. Considering the needs of bridge operation and maintenance in the later stage of the bridge, when the dead weight of concrete diagonal pull bridge is within the ideal range, the concrete swivel diagonal pull bridge can be preferred. In order to calculate the dead weight of the selected bridge, the author uses the finite element software to model the whole bridge and calculate the weight of the bridge. The results show that the dead weight of the concrete swivel diagonal pull bridge is too large, which has exceeded the maximum bearing capacity of the existing spherical hinge. In order to continue to use the concrete swivel diagonal pull bridge scheme, it is necessary to optimize the design of the concrete swivel diagonal pull bridge scheme.