E3S Web of Conferences (Jan 2019)

Indicators of reliability and efficiency of construction production processes

  • Losev Konstantin,
  • Chulkov Vitaly

DOI
https://doi.org/10.1051/e3sconf/20199108037
Journal volume & issue
Vol. 91
p. 08037

Abstract

Read online

The study contributes to interrelation of innovative and traditional indicators of reliability and efficiency of construction production processes. The object of the article is organizational and technological potential of the processes of construction production and two of its research directions: 1) an infographic modeling of the parameters for the creation and functioning of systems of organizational design and management in construction; 2) a concept of organizational and technological potential (of the efficiency of the construction process). An important aspect of the sufficiency of the potential of the reliability of construction production is the use of a balanced system of interrelated indicators. The subjects of research in the article are innovative and traditional indicators of reliability and efficiency of construction production processes. The task of the study was to analyze interrelation of innovative and traditional indicators and determine groups of interrelated indicators and determine the average values of the readiness indicator value ranges. An infographic modeling method and a predominantly deterministic inverse multi-stage dynamic perspective factor analysis have been used in the study. The four groups of interrelated indicators have been determined for a construction company performance evaluation: financial, client, internal business processes, training and development. The average values of the readiness indicator value ranges have been obtained by the average statistical values of mean time between failures: 0.86-0.92 for technical equipment and SMIT; 0.80-0.85 for material resources and components; 0.78-0.83 for labor resources.