Известия высших учебных заведений: Проблемы энергетики (Dec 2017)

SOME OUTCOME OF OMSK HEAT TRANSMISSION PRESSURE TESTS

  • D. V. Zhukov,
  • S. V. Chicherin

DOI
https://doi.org/10.30724/1998-9903-2017-19-1-2-15-22
Journal volume & issue
Vol. 19, no. 1-2
pp. 15 – 22

Abstract

Read online

The current situation is demonstrated. The process within a certain heat service company is shown. Direct connection for service water warming is typically used now. The paper features that heat energy should be transferred from the hot water network via a heat exchanger, and is then used in a secondary, hydraulically separate circulation in the building.

Keywords