Mathematics (Nov 2021)

A Comprehensive Fuzzy Decision-Making Method for Minimizing Completion Time in Manufacturing Process in Supply Chains

  • Fahad Kh. A.O.H. Alazemi,
  • Mohd Khairol Anuar Bin Mohd Ariffin,
  • Faizal Bin Mustapha,
  • Eris Elianddy bin Supeni

DOI
https://doi.org/10.3390/math9222919
Journal volume & issue
Vol. 9, no. 22
p. 2919

Abstract

Read online

In manufacturing firms, there are many factors that can affect product completion time in production lines. However, in a real production environment, such factors are uncertain and increase the adverse effects on product completion time. This research focuses on the role of internal factors in small- and medium-scale supply chains in developing countries, enhancing product completion time during the manufacturing process in fuzzy conditions. In the first step of this research, a list of factors was found clustered into six main groups: technology, human resources, machinery, material, facility design, and social factors. In the next step, fuzzy weights of each group factor were determined by a fuzzy inference system to reflect the uncertainty of the factors in utilizing product completion time. Then, a hybrid fuzzy–TOPSIS-based heuristic is proposed to generate and select the best production alternative. The outcomes showed that the proposed method could generate and select the alternative with a 10.13% lower product completion time. The findings also indicated that using the proposed fuzzy method will cause less minimum variance compared to the crisp mode.

Keywords