E3S Web of Conferences (Jan 2022)

Research on the area of mechanized construction of transmission lines

  • Zhou Tiejun,
  • Gan Jingshuang,
  • Li Lingyun,
  • Xia Zhongyuan

DOI
https://doi.org/10.1051/e3sconf/202235801010
Journal volume & issue
Vol. 358
p. 01010

Abstract

Read online

In order to continuously improve the construction capacity of power grid projects, improve the level of construction technology, and promote the transformation and upgrading of construction enterprises, power companies actively promote the mechanized construction of transmission lines. On the basis of summarizing the existing calculation rules of mechanized construction area, through on-site investigation and extensive collection of funds, research and excavate indicators that adapt to the new situation and new regulations. According to the actual area composition of the mechanized construction site, scientific calculation rules are formulated by modeling analysis and other methods. Compare and verify the calculated area of the new rule with the actual compensation area and the calculated area of the original rule, and propose a complete set of calculation rules for mechanized construction area, which has the conditions and value for popularization and application.

Keywords