E3S Web of Conferences (Jan 2018)

4D modeling in high-rise construction

  • Balakina Anastasiya,
  • Simankina Tatyana,
  • Lukinov Vitaly

DOI
https://doi.org/10.1051/e3sconf/20183303044
Journal volume & issue
Vol. 33
p. 03044

Abstract

Read online

High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.