Shanghai Jiaotong Daxue xuebao (Dec 2021)
Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems
Abstract
In order to further enhance the active power regulation capacity of East China power grid, this paper analyzes the necessity of constructing an operation reserve system of East China power grid under the new power systems construction from the aspects of receiving end characteristics, new energy development, net load fluctuation, and the demand of power market reform. Furthermore, it proposes an operating reserve proposal system of East China power grid under the new situation based on the status of typical power systems at home and abroad. The suggested operating reserve system reorganizes and revises the principles of reserve classification, response time, and minimum reserve configuration. The results verify the effectiveness of the proposed operating reserve system through the measurement and analysis of the actual operation data of the East China power grid.
Keywords