E3S Web of Conferences (Jan 2023)

Layout Scheme Comparison of the Switching Station of Guoduo Hydroelectric Project Based on AHP-TOPSIS

  • Wen Hao,
  • Shi Liu,
  • Wang Yakun,
  • Ni Ting

DOI
https://doi.org/10.1051/e3sconf/202338503004
Journal volume & issue
Vol. 385
p. 03004

Abstract

Read online

The combination of AHP and TOPSIS can make the evaluation method easy to operate, and improve the objectivity and accuracy of the results. The mathematical model for the switching station scheme optimization was set up to choose an appropriate layout for the Guoduo hydropower station. Through the field survey and literature review, the expert questionnaire was finished. The weights of the index were calculated using the AHP method. Then the improved TOPSIS was employed for the index standardization and the sequencing calculation. The final option of layout 2 was obtained.