Mining and Metallurgy Engineering Bor (Jan 2015)

Take up pulley selection of belt conveyor for the ore in terms of axle sizing

  • Rajković Branislav,
  • Ilić Zoran,
  • Urošević Daniela

DOI
https://doi.org/10.5937/MMEB1502089R
Journal volume & issue
Vol. 2015, no. 2
pp. 89 – 100

Abstract

Read online

This work gives the methodology of take up pulley axle calculation on the example of belt conveyor for ore T 3505 designed for the needs of Majdanpek open pit with capacity of 800 t/h. The analysis was made by calculation and represents a universal method for belt conveyor take up pulley axle calculation whose results are indispensable for reliability the check of this important part of belt conveyors. Also, technical characteristics of all elements of the take up assembly are given, as well as their graphical representation.

Keywords