Revista Técnica de la Facultad de Ingeniería (Apr 2010)

Bridge preventive maintenance based on life-cycle assessment Mantenimiento preventivo de puentes basado en evaluación en el ciclo de vida

  • David de León Escobedo,
  • Andrés Torres Acosta

Journal volume & issue
Vol. 33, no. 1
pp. 3 – 10

Abstract

Read online

A criterion for preventive maintenance scheduling (PMS) is proposed based on the history of previous damage occurrences, duration of repairs or maintenance, and the development of cost functions. The PMS method describes the performance of the bridge for the deterioration/damage events and maintenance actions during the bridge’s service life. The time to failure and repair time are modeled as random variables. Sensitivity studies show that the maintenance cost by damage consequence, an indirect measure of the bridge importance, plays a significant role on the optimal maintenance periodSe propone un criterio para programación de mantenimiento preventivo de puentes (PMS) basado en la historia previa de daños y reparaciones o duración del mantenimiento, y en el desarrollo de funciones de costo en el ciclo de vida. El método PMS describe el desempeño del Puente a medida que ocurren los eventos de daño/deterioro así como sus respectivas acciones de mantenimiento durante la vida de servicio u operación del puente. El tiempo a la falla y el de reparación se modelan como variables aleatorias. Estudios de sensitividad demuestran que los costos por consecuencias del daño, una medida indirecta de la importancia del puente, juegan un papel significativo en el periodo óptimo de mantenimiento

Keywords