E3S Web of Conferences (Jan 2018)

The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

  • Zhadanovsky Boris,
  • Sinenko Sergey

DOI
https://doi.org/10.1051/e3sconf/20183303077
Journal volume & issue
Vol. 33
p. 03077

Abstract

Read online

Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.