Journal of Asian Architecture and Building Engineering (Mar 2024)

Methodology for construction-standard-production-rate-based simulation modeling and production-rate data generation

  • Yongho Ko,
  • Yujin Kim,
  • Jaeyun Noh,
  • Kanghyeok Lee,
  • Dohyoung Shin,
  • Seungwoo Han

DOI
https://doi.org/10.1080/13467581.2023.2278885
Journal volume & issue
Vol. 23, no. 2
pp. 725 – 739

Abstract

Read online

While implementing a construction project, production-rate assessment needs to be conducted throughout the different stages of the project because this assessment can determine the success or failure of the project. In South Korea, the construction-standard-production-rate (CSPR) is used for determining the production-rate of individual construction equipment. However, CSPR cannot provide the production-rate of activities considering a combination of more than two different types of equipment (eg, excavator and dump truck used for excavation-load-haul activities). Having ready-made data on such production-rates of different equipment combinations would be beneficial for determining and optimal fleet management plan. Furthermore, such data can be beneficial for implementing optimized scheduling methods using supervised-learning methods. Accordingly, simple discrete event simulation approaches were carried out for data generation and regression analysis for testing the feasibility of the usage of such data. The time inputs used in this study were calculated based on the equations and information given in the CSPR.

Keywords